![2023 11 14 Szijjarto Lihacsov 4](https://english.atlatszo.hu/wp-content/uploads/2024/01/2023_11_14_Szijjarto_Lihacsov-4-masolata-700x420.jpg)
We are suing for the Paks II licensing documents, still no consensus on the risks of the tectonic fault line
The Hungarian Atomic Energy Authority refused to comply with our freedom of information request.
The Hungarian Atomic Energy Authority refused to comply with our freedom of information request.
According to our on-site measurements, even the power reduction was not sufficient to allow the plant to maintain the 30 degree heat limit in the river Danube.
Four years ago, and now again, we measured higher water temperatures in the Danube at the Paks Nuclear Power Plant...
According to an official document obtained by Átlátszó, János Süli, the Hungarian minister responsible for the Paks NPP expansion, prepared...
Although the Hungarian Atomic Energy Authority (HAEA) has not yet issued the Paks II construction license but has requested further...
The site of the Paks NPP and the planned Paks II NPP are not suitable for the construction of a...
The Paks NPP and the site of the planned Paks II NPP are not suitable for the construction of a...
A recently published geophysical study analyzing the geological exploration data of the Paks-II nuclear power plant site concludes that the...
State-owned company Paks II. Zrt., responsible for the expansion of the Paks NPP with new nuclear power plant units ordered...
Hungary is home to a number of nuclear facilities. While the Paks nuclear power plant is known to everybody, the...
The https://english.atlatszo.hu use cookies to track and profile customers such as action tags and pixel tracking on our website to assist our marketing. On our website we use technical, analytical, marketing and preference cookies. These are necessary for our site to work properly and to give us inforamation about how our site is used. See Cookies Policy